try the craigslist app » Android iOS
favorite
favorite
hide
unhide
flag

Posted

print

1978 Honda CB550 Cafe Racer - $5500 (Queens)

123456789101112131415161718192021

1978 Honda CB550F

condition: excellent
engine displacement (CC): 550
fuel: gas
paint color: grey
title status: clean
transmission: manual

See current video here (shot 11/23/2019):
https://youtu.be/IyqWGF-l8zY

1978 Honda CB550F – $5500 (OBO)
– Never dropped
– Garage kept
– Consistent maintenance and care have kept the bike in prime condition
– Loud "throaty" exhaust
– Responsive

Also includes:
– Battery Tender
– Drop bars (clip-on cafe racer style)
– Bike Cover (great condition)
– Stock Mirrors

See initial bike build here:
https://youtu.be/2AaftbjJH5g


DETAILS:

FRAME
• Bike was completely disassembled
• Frame was modified for the desired look and was sandblasted and coated with a PPG Urethane basecoat/ clear coat
• All frame bolts were either polished up or replaced with new ones

ENGINE
• Engine block was compression tested and found to have around 130 psi in each cylinder and are all within 5% of each other. So internals were left alone and the case was thoroughly cleaned, blasted and ceramic coated satin black.
*The stock Phillips head engine screws were replaced with a stainless steel Allen head bolt kit.
*All 8 valve tappet cover seals were replaced
*New clutch housing gasket was installed
*New points cover gasket was installed
*New head side cover seals were installed
*Valve clearance was checked and adjusted
*Cam chain tension was adjusted
*Points were cleaned and gapped
*Engine Ignition static timing was set
*Various covers were polished
*New intake manifold gaskets were installed
• New NGK D9EA Spark plugs were installed
• 4 new engine cover seals were replaced
• A new OEM Honda oil filter and seal was installed along with a new oil filter housing bolt.
• A New Delkevic 4 into 1 Stainless Steel Header was installed
• A new Radiant Cycles 2.5" Shorty muffler was installed

CARBS
• Carbs were completely tore down and cleaned
• Bowls and Top covers were polished
• Carb bodies were ceramic coated satin black
• All new seals gaskets and prongs were installed
• Carbs were jetted because of the pod filters and free flowing exhaust (They were fitted with 105 main jets and the slide needles were moved up 1 notch)
• New carb boot clamps were installed
• New Pod filters were Installed

WHEEL SETS
• Wheels were were broken down and had the spokes re zinced
• The Hubs and rims were blasted and Painted with a black urethane basecoat/clearcoat
• The wheel Sets were re assembled, spoked, and trued
• New inner rubber strips were installed on the rims
• New inner Tubes were installed in both wheels
• New Kenda challenger tires were installed Front 110/90/19 Rear 120/90/18

BRAKES
• Rear brake shoes were installed with new hardware then linkages were adjusted and greased
• Front brake caliper was completely stripped , blasted, and rebuilt. A new piston, new seal, new bleeder screw and new pads were installed. Then the bodies were Painted black and clear coated.
• A new Braided Stainless Steel brake line kit was installed.
• A new master Cylinder was installed along with new brake fluid.

ELECTRICAL
• A new set of Accel Ignition 2 Super Coil Kit were added
• New Pamco Electronic Ignition
• The wire harness was removed and all terminals were cleaned
• A new headlight with integrated LED turn signals was installed.
• A new 32 LED Brakelight, tail light, and turn signal unit was installed on a custom fabricated bracket which mounts flush under rear seat for a clean look.
• A new Electronic LED flasher was installed
• 2 new LED turn signal resistors were installed
• A new horn was installed
• A new Mini Speedometer was installed
• A new KMG Battery was installed
• Any unnecessary gauges or lights were eliminated for a clean, simple look

SUSPENSION
• Front forks were disassembled, cleaned, and new fork seals and oil were installed. They were raised through the trees for a lower profile and 3/4" pre load spacers were installed in the forks to stiffen up the front and minimize travel.
• Rear Shocks were replaced with new Adjustable Shocks

BODY/ CONTROLS
• New fork mounted Cafe racer bars were installed
• New bar mount left mirror was installed
• Original clutch cable was lubricated and reinstalled then adjusted for a proper release
• Original Throttle and choke cables were cleaned, lubricated, installed and adjusted.
• A new Drive Chain was installed along with new Chrome Chain tensioners.
• A new curved License plate bracket was installed
• The Original seat pan was blasted, fabricated and repainted for the look of the bike and uses all the factory mounting points and the original seat lock. It was then sent to be professionally upholstered.
• The tank was sandblasted and repainted using a urethane Base coat/ clear coat system. Destroyer grey with a black side panel. The side covers were also redone with new 550Four lettering integrated in the paint scheme. The paint was then wet sanded and thoroughly polished to a show quality finish.
• The stock rear fender was shortened, sand blasted and Painted to match the tank paint scheme.
• The front fender was shortened, sandblasted and painted Destroyer Grey to match the tank.
• A Stock 74 Honda tank emblem set was stripped and restored , mounted on the tank.
• The inside of the tank was de rusted and had a new Tank liner installed
• A new Petcock and fuel line was installed

***Special thanks to a lot of awesome guys on SOHC4.com, Brennan over at Vintage Moto and Neno in LI who helped complete the work.


SERIOUS INQUIRIES ONLY
The listing and details above are meant to answer a majority of the questions that arise. Please read thoroughly.
  • do NOT contact me with unsolicited services or offers

post id: 7026077488

posted:

updated:

best of [?]